About the company / Reference list
"SINETIC" Ltd.
Ust-Kamenogorsk
official partner of SIEMENS
official distributor of RITTAL
sales partner of PHOENIX CONTACT
| Juridical address:
070005, г. Ust - Kamenogorsk , 181/3, prospect Abaja, office 406
account№ 022467124, JSC " BTA Bank"
BIC 190901310, TIN 181600087083
tel/fax: +7(7232) 413-000
mail: ustkam@sinetic.kz
|
Dear Sirs!
SINETIC Ltd. is an engineering company realizing complex systems of workflow automation and delivering the equipment to some Kazakhstan enterprises. Being the official partner of the workflow automation department SIEMENS, a distributor of RITTAL, a sales partner of PHOENIX CONTACT, SINETIC Ltd. takes an active part in reconstructing enterprises of different industrial branches accommodating the design, delivery, mounting and testing, starting-up and adjustment the equipment and training specialists. We have acquired great experience in designing and realizing the systems of workflow automation.
Here are some of our clients:
JS «AES Ust-Kamenogorsk heat and power plant»
2004 |
Delivery the equipment for existing automation systems |
2005 |
Elaborating the design and software, delivery, mounting ,starting-up and adjustment the equipment for the pumping station № 3 |
Training specialists |
2006 |
Automation control system of balancing flows of coal conveyers. 3А, 3B |
2006 |
Elaborating the design and software, delivery, mounting, starting-up and adjustment the equipment for automated control system of turbo set № 10 |
2007 |
Elaborating the design and software for automated control system of steam generating unit №12 |
2008 |
Delivery, mounting ,starting-up and adjustment the equipment for steam generating unit №12 |
JS «AES Sogra Heat and Power Plant »
2004 |
Elaborating the design and software for automated control system of the pumping station № 2 |
Delivery, mounting ,starting-up and adjustment the equipment for the pumping station № 2 |
Training specialists |
2006 |
Elaborating the construction trend of workflow automation. |
"AES Ekibastuz"Ltd. Hydroelectric Regional Power Station 1
2007 |
Delivery and mounting the equipment for local requests distribution devices 0,4 кV |
JS «Euroasia Energy Corporation»
2003-2004 |
Elaborating technical documentation on schemes of switching the sensing units and devices, cable traces for downstream workflow for energy automation units № 3, 4 of Aksuss Heat and Power Plant |
2006 |
Delivery the automation equipment |
«АES Shulba heat and power plant »Ltd.
2006 |
Elaborating the design and software for monitoring system |
2007 |
Setting in operation the monitoring system |
2008 |
Setting in operation the control system of oil production enterprise |
«Atyirau Refinery» Ltd.
2006 |
Automated control system of the common flare system and the flare systems of acid gas |
Automated control system of petrol conveyance to a new hydro fining plant |
Delivery license software Siemens |
JS «Ulba Metallurgical Plant»
2002-2005 |
Delivery the equipment for reconstruction of uranium, beryllium, tantalum production. |
Training specialists |
JS «Ecoton+»
2003-2004 |
Automation system for the aerated concrete manufacture plant production in Astana |
2007 |
Elaborating the design and software for automated control system of the aerated concrete manufacture plant production in Actobe |
Being realized |
Delivery, mounting, starting-up and adjustment the equipment for the aerated concrete manufacture plant production in Actobe. |
Zink Plant of the Balkhash Mining and Metallurgy complex JS “Kazakhmyis”
2003 |
Complex control system and accident prevention system in the pressure leaching unit |
Training specialists |
JS«Kazzink»
2002 |
Parameters workflow automation in section 4 corpus flotation № 3 in Ridder dressing industrial complex |
Training specialists |
2006 |
Delivery automation equipment |
JS «Bukhtarma Cement Company»
2006 г. |
Automatiс batching system of loose materials into batch mills. |
Parameters control system for adjustable furnace № 4 |
Delivery automation equipment |
2007 г. |
Elaborating the design of workflow automation for the compressor station |
Being realized |
Delivery, mounting, starting-up and adjustment the equipment of workflow automation for the compressor station. |
2007 |
Elaborating the design of workflow automation for the site of grinding. |
Being realized |
Delivery, mounting, starting-up and adjustment the equipment of workflow automation for the site of grinding |
«Nurkazgan Concentration Plant» OJS "TOMS Industrial"
Being realized |
Delivery and mounting the equipment low voltage complex devices and automated control systems |
Starting-up and adjustment |
JS Finance and Invest Company "ALEL"
2007 |
Delivery the control equipment and cubic controlling workflow automation |
JS "Astana-Teplotransit"
2006 |
Delivery the control equipment and controlling the heat item in Astana at the crossing of Ulitsa №13 and Ulitsa. |
Starting-up and adjustment and setting in operation. |
2007 |
Elaborating the software, delivery the control equipment of the pumping station № 6 in Astana. |
2008 |
Starting-up and adjustment and setting in operation the control system of the pumping station № 6 in Astana. |
"Isotem" Ltd.
2007 |
Elaborating the software, delivery the control equipment and setting in operation the pumping conveyers control system in production of mineral cotton in Glubokoe, EKO. |
JS «West- Kazakhstan Machine-Building Company » (Uralsk), JS «Kaspiy Oil » (Atyirau), JS ТНК «Kazchromium» (Chromtau), «Firm ENCY» Ltd.(Stepnogorsk), «Arai-91»Ltd. (Lisakovsk).
We are glad to offer you the complex solution of your problems in automation, deliver the equipment, elaborate the system, mount, test, start up, adjust and set in operation and train your specialists.
Our lisence:
The state Lisence on work ГСЛ №008464 from 04.04.2002 .
For further information see www.sinetic.kz
|
|